El-Kureimat 2x600 MW Power Project, Egypt

  • A 1.2$ Billion 1,200 MW mazout (residual oil) and gas-fired power plant
  • Two outdoor-type pressurized furnaces with drum-type steam generators, each with its own chimney
  • Two tandem compound four flow, single reheat turbine generators
  • Common control room with microprocessors and distributed control system
  • Switchyard with 500 kV and 220 kV GIS equipment and transmission lines
  • Due to its innovative approach and linkage of multi-source funding, project packaging, and procurement, K&M achieved a cost-savings of over $350 million for the Egyptian Electricity Authority from the original project budget.

  • K&M coordinated the project development and financial engineering in two phases.
  • Phase I assistance included preliminary engineering and procurement of Civil, Architectural, and Engineering Works contract packages.
  • Phase II support services include all post-contractual duties such as:
    • Design review of the detailed engineering performed by the contractors
    • Construction Management
    • Training programs
    • Assistance in startup, testing, commissioning, and initial operations