- A 1.2$ Billion 1,200 MW mazout (residual oil) and gas-fired
power plant
|
- Two outdoor-type pressurized furnaces with drum-type steam
generators, each with its own chimney
|
- Two tandem compound four flow, single reheat turbine generators
|
- Common control room with microprocessors and distributed
control system
|
- Switchyard with 500 kV and 220 kV GIS equipment and transmission
lines
|
- Due to its innovative approach and linkage of multi-source
funding, project packaging, and procurement, K&M achieved
a cost-savings of over $350 million for the Egyptian Electricity
Authority from the original project budget.
|