1. GENERAL
Furnish And Install All Unitized Movable Metal Partitions As
Indicated On Architect's Plans And Specifications. Partition
Shall Be "Benchmark Series I" As Manufactured By Dowcraft
Corporation, Falconer, New York. Partition Design Shall
Consist Of 2-3/8" Thick Insulated Metal Panels, With
Projecting Continuous Ceiling Channel, Recessed Vertical
Feature Strips, And Flush Continuous Base. System Shall Be
Non-Progressive.
2. SHOP
DRAWINGS
Drawings Showing Floor Plans, Typical Elevations,
Construction Details, Materials, Finishes, Hardware, And
Special Conditions Will Be Submitted For Approval After
Receipt Of Purchase Order. Material Requirements Will Be
Released For Fabrication After Receipt By Partition
Manufacturer Of Approvals And Schedules.
3. PANELS
ALL STEEL PANEL: Shall Be 2-3/8" Thick, Constructed
Of Two Formed Sheets Of Tension Leveled Furniture Grade
Steel - Reinforced Horizontally On Approximate 12" Centers
With Solid Organic Fiber Ribs Glued To Each Panel Surface
For Strength And Rigidity - And Fully Insulated With 3 Lb.
Density Mineral Wool. Panel Verticals Shall Be Securely
Attached To The Panel And Slotted Vertically On 1-1/2"
Centers To Facilitate Hanging Of Furniture. Panel Bottom
Shall Have Two Threaded Levelers For Height Adjustment And
Continuous Retainer Clip For Removable Base.
END FILLER PANEL: Shall Be Constructed Similar To All
Steel Panel With Slotted Vertical One Edge - With Other Edge
Having 2" Deep Overlapping Wall Channel With Light And Sound
Seal To Facilitate Width Adjustment. End Filler Panels Are
Designed To Be Field Cut.
ALL GLASS PANEL: Shall Be A Unitized Construction
Steel Frame And Shall Accommodate Glass Up To 1/4" In
Thickness. Glass Shall Be Furnished By Partition
Manufacturer To Design, Quality, And 1/4" In Thickness.
Frame And Glass To Be Completely Factory Assembled Utilizing
Vinyl Glazing Material In Continuous Glass Grooves And
Without The Use Of Projecting Glass Stops. Dowcraft
Corporation Will Supply 1/4" Clear Tempered Glass Unless
Other Wise Specified. Panel Bottom Shall Have Two Threaded
Levelers For Height Adjustment And Continuous Retainer Clip
For Removable Base.
OPTION (SPECIFY): Glass And Glazing Labor Shall Be
Furnished "By Others" At The Jobsite.
4.
COMMON PARTS
PROJECTING, CONTINUOUS CEILING CHANNEL: Shall Be
Formed Steel, 2-1/4" Deep, In 120" Lengths, With
Factory-Applied Light And Sound Seal.
RECESSED VERTICAL FEATURE STRIPS: Shall Be Heavy
Gauge, High Impact Abs Plastic, 5/8" Wide And Recessed From
The Panel Face. Strips Shall Provide Positive Interlock And
Alignment Of Panels Without Use Of Clips.
FLUSH, CONTINUOUS BASE: Shall Be Nominal 4-1/2" High
And 96" Long.
FLOOR CHANNEL: To Be Furnished In 120" Lengths With
Factory-Applied Light And Sound Seal.
OPTIONAL FLUSH UNITIZED BASE: Shall Be Nominal
4-1/2" High All Panels To Be Shipped With Factory Attached
Floor Channel And Base Trim Both Sides. Base Design Shall
Incorporate A Vertical Butt Jolnt To Provide Continuous
Look. Unitized Base To Be An Integral Part Of The Panel
Assembly. (Note: See Electrical Option).
5. MATERIAL All Exposed Sheet Metal
Shall Be Cold Rolled Tension Leveled Furniture Grade Steel
That Has Been Properly Annealed, Process Levelled, With
Smooth Clean Surfaces. Gauge Specified Is United States
Standard. Standard Metal Gauges Shall Be:
-PANEL FACE
|
20 GAUGE
|
-SLOTTED VERTICAL
|
18 GAUGE
|
-GLASS RAILS
|
20 GAUGE
|
-DOOR FRAMES
|
18 GAUGE
|
-CEILING CHANNEL
|
20 GAUGE
|
-BASE TRIM
|
18 GAUGE
|
-FLOOR CHANNEL
|
18 GAUGE
|
6. FINISH
PRIME: All Parts Shall Be Thoroughly Degreased,
Cleaned, And Treated With An Etched Phosphate Rust Resistant
Coating And Be Free From Dirt And Rust.
ENAMEL: Surface Shall Be Prepared As Shown Above
After Which Quality Semi-Gloss Rubbed Effect Synthetic
Enamel Of Standard Selected Color Shall Be Factory Applied
And Then Baked On.
OPTIONAL MATERIALS AND FINISHES: Available On Special
Basis. For Fabric, Vinyl, Textured Steel, Custom Colors, Etc
- Consult With Factory For Availability, Pricing, And
Delivery.
7. STRUCTURAL IMPACT LOAD TEST
Partition Has Been Laboratory Tested According To Astm
E-72-80 To Prove That Deflection Will Not Exceed L/120 With
A 5 Pound Per Square Foot Live Load Applied Uniformly Over
The Surface Of Panel. Certification Provided With Approved
Shop Drawings.
8.
INSTALLATION
Partition Shall Be Installed Over Finished Floor And Under
Suspended Ceiling. Installation Shall Be Performed In A
Craftsman-Like Manner With All Vertical Lines Straight And
Plumb And All Horizontal Lines Level. Installation Methods
Shall Not Cause Any Penetration Of Building Floor Or Ceiling
Surfaces. Attachment To Ceiling Grid Shall Be Accomplished
With Non-Penetrating Clips. Installer Shall Utilize Velcro
Carpet Grippers Or Double-Faced Tape As Needed For
Designated Floor Coverings. [Door Frame Stirrups May Be
Anchored, If Required, With End User's Approval]. Where
Required, Partition Shall Be Neatly Scribed To Fit Existing
Building Conditions As Shown On Approved Drawings. Hardware
Shall Be Properly Adjusted And Left In Proper Working Order.
Paint Touchup Shall Be Made To All Nicks And Scratches That
Occur To Partitions During Handling And Installation.
Partition Contractor Is Not Responsible For Damage Occurring
After Installation Is Completed.
Back to