The Wilson T. Ballard Co.
       

Home
Description
Clients
Employment Opportunities
Contact Us
 
Engineering Departments
Civil/Site Engineering
Environmental Engineering
Structural Engineering
Transportation Engineering
Water/Sewer Engineering

Previous
Forward

I-95: I-495 to Patuxent River


I-95

Location: Prince George's County, Maryland
Clients: Maryland State Roads Commission

We surveyed and designed seven miles of the 22 mile long portion of I-95 between the Washington and Baltimore beltways, including major interchanges at MD 212 and MD 198. Opened in 1971 as an alternate route to the Baltimore-Washington Parkway, the 8-lane I-95 initially carried about 31,000 vehicles per day; by 1998 that had increased to 165,000, with no significant changes to the roadway during that 27 year period.

Our services included surveys and design of the highway, bridges, and roadway lighting and signing.

© 1999 The Wilson T. Ballard Co., All Rights Reserved